    Quote Originally Posted by rdavies View Post
    Tim Hortons Field June 7/2014

    It looks like they're fairly far behind Ottawa.

  2. #2
    Banned
    Points: 10,146, Level: 67
    Level completed: 24%, Points required for next Level: 304
    Overall activity: 0%
    Achievements:
    Veteran10000 Experience Points

    Join Date
    Oct 2013
    Posts
    1,025
    Points
    10,146
    Level
    67
    Quote Originally Posted by Neely2005 View Post
    It looks like they're fairly far behind Ottawa.
    Why would you make that comparison when Ottawa already had a stand ready to be refurbished and already started refurbing before Hamilton even got started. This project has been plagued by haters and conspiracy wingnuts since day one. Still don't know why because if you follow modern stadium construction (and planning for the future) it is way ahead of the curve.

    It may not be fully completed by July 26, you may have to drink your beer from a bottle poured to a cup and you may have a long lineup to take a leak in one of the possibly few finished cans, but you'll have a seat and watch players playing on their new FieldTurf Revolution field.

  3. #3
    Bleeds Double Blue
    Points: 44,706, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 0%
    Achievements:
    Tagger Second ClassOverdriveVeteran25000 Experience Points
    Neely2005's Avatar
    Join Date
    Oct 2013
    Location
    At the Tailgate
    Posts
    5,007
    Points
    44,706
    Level
    100
    Quote Originally Posted by rdavies View Post
    Why would you make that comparison when Ottawa already had a stand ready to be refurbished and already started refurbing before Hamilton even got started. This project has been plagued by haters and conspiracy wingnuts since day one. Still don't know why because if you follow modern stadium construction (and planning for the future) it is way ahead of the curve.

    It may not be fully completed by July 26, you may have to drink your beer from a bottle poured to a cup and you may have a long lineup to take a leak in one of the possibly few finished cans, but you'll have a seat and watch players playing on their new FieldTurf Revolution field.
    Just commenting on the 2 pictures. Ottawa looks much further along.

    Also it's been my experience that renovating something usually takes longer than tearing it down and starting from scratch. So I'm not sure that Ottawa had any advantage over Hamilton in that regard.
    Last edited by Neely2005; 06-18-2014 at 02:14 PM.

  4. #4
    Moderator
    Points: 40,558, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 67.0%
    Achievements:
    Created Album picturesOverdriveVeteran25000 Experience Points
    ArgoGabe22's Avatar
    Join Date
    Nov 2011
    Posts
    4,862
    Points
    40,558
    Level
    100
    Quote Originally Posted by Neely2005 View Post
    Also it's been my experience that renovating something usually takes longer than tearing it down and starting from scratch. So I'm not sure that Ottawa had any advantage over Hamilton in that regard.
    Hamilton started from scratch. They decided to rotate the endzones ever since their star signing, Sandro DeAngelis couldn't hit a FG.